Unitech Power Systems AS is partnering with ETAP for real time solutions.
Unitech Power Systems have, in co-operation with the Norwegian Petroleum Safety Authority, issued a report on design of electrical systems without dedicated emergency power system.
First oil from the Ivar Aasen field came on Christmas Eve 2016.
During 2014 and 2015 Unitech Power Systems performed analyses of switching transients in the new grid connection between Kollsnes and Lindås in Norway.
Arcs in electrical equipment are a danger to personell in the vicinity of the equipment. Unitech Power Systems has long experience in calculating arc flash energy levels.